Sidewalk & Trail Repair Program (ongoing) This program enhances pedestrian safety and accessibility by rehabilitating and maintaining sidewalks and addressing sidewalk network connectivity throughout the city.
Street Reconstruction Program (ongoing) Some streets are past their useful life, and surface treatments are no longer an option for these roads.
Brighton Stormwater Improvements The existing corrugated metal pipe has reached the end of its useful life (2025 project)
Seven Hills Lake Watershed Phase 1 The existing corrugated metal pipe has reached the end of its useful life (2025 project)
Stormwater Infrastructure (ongoing) These projects help maintain Lenexa's stormwater infrastructure and fund emergency repairs.
89th Terrace to 90th Street - West of Lackman Road The existing corrugated metal pipe has reached the end of its useful life (2025 project)
87th Street & Bluejacket Street Replace or rehabilitate corrugated metal pipe that has reached the end of its useful life (2025 project)
107th Street to 108th Street - West of Pflumm Road Replace or rehabilitate corrugated metal pipe that has reached the end of its useful life (2025 project)
81st Street to 81st Terrace - East of Maurer The existing corrugated metal pipe has reached the end of its useful life (2025 project)
IT Infrastructure Program (ongoing) The project funds on improved security and disaster recovery capabilities for server infrastructure, upgrades and replacements, data storage and cybersecurity enhancements.